Concrete pile and pier calculator
Concrete volume for round form-tube piles for decks and footings, as ready-mix cubic metres or 30 kg bags, with the tubes needed.
Your job
Must reach below frost depth and to the bearing layer your engineer or permit requires.
Holes are rarely exact; 10% is typical.
Answer
- Concrete to order
- 1 m³ (1.31 yd³)
- Volume per pile
- 0.141 m³
- Total with waste
- 0.93 m³
- Bags if mixed on site
- 67
- Form tubes
- 6 x 2 m
- Small ready-mix orders usually carry a short-load charge.
- Check pile depth against local frost depth and the permit drawings; this calculator does not size piles.
Method: Volume = pi/4 x diameter² x length per pile, plus waste; ready-mix in 0.25 m³ steps; A 30 kg bag of mix yields about 0.014 m³ (manufacturer data)
Estimating aid based on a summary of the CEC. Provinces adopt different editions and amendments. Confirm with the authority having jurisdiction, and the engineer of record where one is involved.
Priced takeoff
- Ready-mix concrete 25 MPa, piles$202.001 m3 at $202.003.5 h
- Form tube 300 mm x 2 mprice pending6 ea
- Materials
- $202.00
- Labour, 3.5 h at $105.00
- $367.50
- Your cost, before markup and tax
- $569.50
Reference prices are dated baselines (2026-11) for Ontario. Confirm them with your supplier. In TradeQuote PRO your own saved prices replace these.
How it works
You enter 6 inputs. The calculator returns the quantities, rounds them up the way the material is sold, and lists the takeoff so it can be priced.
- Number of piles.
- Tube diameter.
- Depth below grade (m). Must reach below frost depth and to the bearing layer your engineer or permit requires.
- Height above grade (m).
- Waste allowance (%). Holes are rarely exact; 10% is typical.
- Concrete supply.
The method
- Volume = pi/4 x diameter² x length per pile, plus waste; ready-mix in 0.25 m³ steps
- A 30 kg bag of mix yields about 0.014 m³ (manufacturer data)
Check results against the code and manufacturer data that apply to your job. Prices are dated baselines to confirm with a supplier.